What is a Procedure Qualification Record (PQR) and how does it relate to a WPS?

Get ready for the CSA Standard W47.1-09 CWB Welding Supervisor Test with comprehensive flashcards and multiple choice questions, complete with hints and explanations. Prepare effectively for your certification exam!

Multiple Choice

What is a Procedure Qualification Record (PQR) and how does it relate to a WPS?

Explanation:
A Procedure Qualification Record is the formal record of a welding procedure qualification test. It captures the procedure used, including process, base metal, filler metal, joint design, thickness, and any preheat or interpass temperature requirements, along with the welding parameters actually used and the test coupons prepared. It then shows the results of the required inspections and mechanical tests, demonstrating that the welds meet the applicable criteria. Because these test results prove the specified procedure can produce sound welds under those conditions, the PQR provides the evidence to support and qualify the Welding Procedure Specification. The WPS is the written guide used in production welding, and the PQR is the data that validates that guide. If any variables are changed, a new PQR (and requalification) is typically required to ensure continued sound welds.

A Procedure Qualification Record is the formal record of a welding procedure qualification test. It captures the procedure used, including process, base metal, filler metal, joint design, thickness, and any preheat or interpass temperature requirements, along with the welding parameters actually used and the test coupons prepared. It then shows the results of the required inspections and mechanical tests, demonstrating that the welds meet the applicable criteria. Because these test results prove the specified procedure can produce sound welds under those conditions, the PQR provides the evidence to support and qualify the Welding Procedure Specification. The WPS is the written guide used in production welding, and the PQR is the data that validates that guide. If any variables are changed, a new PQR (and requalification) is typically required to ensure continued sound welds.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy